Wednesday, December 31, 2008

Inspections

We have reached a point of completion where inspections are done. The City of Derby electrical inspection was done last week and everyone was satisfied. Today a Proffessional Engineer looked at our truss work and that was satisfied. So the system has reached a completion point, but due to some weather issues (today is a snow storm) we have had to hold off on flipping the switch until after the holiday.

I have focused on the hi-tech side of our installation, but the building structure itself had to be reinforced to satisfy the design engineer and building dept. It was a very difficult to access area that required some special rigging of ladders and safety harnesses, and the work was done by one of our employees who is a certified welder from Local 580 Ironworkers Union in NYC.

The below photos are a closup of a truss, a view of trusses over the shop manufacturing space, and a view of the trusses over the warehouse area. The building was constructed in the late 1800's with primarily riveted steel construction, and was first used to make cannons.


No comments: