For over a year, we have been testing an electric passenger vehicle and the ability of it's charging to be done from the capacity of our solar array. The goal is to consider the possibility of electric trucks for delivering our product, which is typically a 120-150 mile round trip in an urban setting.
There are some thought that battery capacity needs to improve so that a vehicle with a load can make the round trip back to home-base.
Federal Express can test components of such a fleet vehicle with perhaps more credibility than our small operation. Read just such a story here:
http://blog.cleantechies.com/2012/02/08/the-future-of-trucking-is-electric/
Photo from Flickr by user LA Wad.
Thursday, February 9, 2012
Thursday, December 29, 2011
Electric Vehicle Test
We have posted in the past about the possible future of electric propulsion for delivery vehicles. (see this entry from 2010Oct) Our typical delivery is a 150mile round-trip, many times with a substantial cargo weight.
Now it seems that FedEx is trying out cargo vans based on Nissan Leaf, and so is the Japan Post. (article link)
Mitsubishi is preparing a light-duty electric truck for farmers and contractors with forecast of 1/2 it's sales to be electric by 2020 (article link). The former President of GM has joined a conversion company that makes hybrid pickups from existing lines (article link).
Big corporate names such as Coca Cola are looking to the future with EV delivery trucks (article link), specifically the Newton by Smith Electric Vehicles. They have a range of up to 150 miles, and speed of 50mph, all while hauling up to 16,000lbs of cargo. They are a target market with 176 purchased by Frito-Lay, 41 purchased by Staples, and plans by AT&T to purchase more, and the U.S. Marines testing a pair of military spec versions.
What does this mean for our company? The range and cargo capacity of all-electric vehicles is approaching the standards needed for our operations. We have been documenting capability of an electric passenger vehicle as preparation for a cargo capable vehicle. As of 2011Dec31, our IDA electric car has nearly 13,000 miles that have been entirely powered with electricity that was generated by our on-site solar array.
Images are drawn from and copyright autoblog.com
Now it seems that FedEx is trying out cargo vans based on Nissan Leaf, and so is the Japan Post. (article link)
Mitsubishi is preparing a light-duty electric truck for farmers and contractors with forecast of 1/2 it's sales to be electric by 2020 (article link). The former President of GM has joined a conversion company that makes hybrid pickups from existing lines (article link).
Big corporate names such as Coca Cola are looking to the future with EV delivery trucks (article link), specifically the Newton by Smith Electric Vehicles. They have a range of up to 150 miles, and speed of 50mph, all while hauling up to 16,000lbs of cargo. They are a target market with 176 purchased by Frito-Lay, 41 purchased by Staples, and plans by AT&T to purchase more, and the U.S. Marines testing a pair of military spec versions.
What does this mean for our company? The range and cargo capacity of all-electric vehicles is approaching the standards needed for our operations. We have been documenting capability of an electric passenger vehicle as preparation for a cargo capable vehicle. As of 2011Dec31, our IDA electric car has nearly 13,000 miles that have been entirely powered with electricity that was generated by our on-site solar array.
Images are drawn from and copyright autoblog.com
Tuesday, October 11, 2011
For Sale - Racks for Storage.
We have dismantled a rack storage structure on the property, and are offering it for sale, in pieces by lot. Possibilities include creating storage in your warehouse, or garage.
The vertical uprights are 30 feet long, but can be cut down to shorter lengths. They are available in both 4ft and 5ft depths.
The horizontal beams are numerous and come in 10ft or 12ft lengths. All beams attach to the verticals with a pin insert for easy attachment or adjustment. The beams feature a shelf where corrugated decking, wire frame, wood, or other such shelf design would sit in.

All parts are sold as is, Cash and Carry, from our location at 200 Roosevelt Drive Derby, during business hours. Business hours are Mon-Fri, 5:30AM-2:00PM. Afternoon or Weekend pickup times can be arranged.
Verticals: $30 each 30ft length
Horizontals: $15 each beam
Verticals can be cut into desired length (example - two 15ft lengths), and each horizontal includes 2 pins for attachment to Verticals.
A single vertical cut in half, plus 4 horizontal beams = $90 for minimum setup. Subsequent verticals can attach to the initial first shelf making incremental increase in storage space even less expensive. Racks are available in either 4ft or 5ft depth shelves. Horizontals are 10ft or 12ft in length. No variation in price among those component sizes.
This storage system is being dismantled from our property (see other blog entries), and has some surface rust spots where a coating of paint would improve it's aesthetics if you desired.
Use these to store small items, or complete pallets of product, even leave the space below open so that you can roll in access to equipment such as a lawnmower or welder and still have storage above.
Questions, contact Thomas Harbinson
thomas.harbinson@ida-intl.com



Friday, September 30, 2011
De-Construction Part6 - Complete
NOTE: Part of our Vision Statement is to be a Respected Company in the Community. That comes through communication regarding our activities. A portion of our property that is in high profile to the community is undergoing some changes. This communication series is to communicate what is happening.
We prepared to dismantle a significant sized structure on our property, starting in August. It was completed by September 30th. The footprint of the warehouse was 42,000 square feet, a light-engineered design style, with everything framed off the steel storage racks which supported the siding, roofing, electrical, plumbing - basically everything. The warehouse was never used by us since moving to the property in the late 1980's. It was a shell that had no stairs, elevator, or other ready access. When the structure was designed, materials and product were delivered via conveyor belt. All of these elements, along with accessory structures, were removed over 25 years ago, previous to our ownership.
The storage rack elements and accessories were all dismantled and removed in two months. 95% of these elements were recycled for their scrap value. Close to 1/2 a million pounds of steel were transported by us to a recycle center within 20 miles. Other materials were taken away as refuse.
While this activity wasn't technically a "demolition", it is important to not that such work, If approached in a proper way, can be accomplished in a "green" manner. Systematically removing the materials made it easy to consolidate for shipping to scrap yard. Keeping the standpipe and cast iron separate from the light steel, allowed us to get the best price rather than be a mixed materials. In essence we were constructing the facility in reverse, or deconstructing it rather than simply demolishing it.
The "floor" of the warehouse (technically not a "building") was elevated and it remains, acting now as a shed roof for our storage area below, sheltering our materials from the weather elements. Longtime local residents may recall that the area below was where the outlet store "Sewers Delight" was once located selling cloth remnants from the days when the location housed a fabric dyeing and printing company (Hull Dye Print Works).
With no specific plans at the present, the steel beams may be wrapped with the material we use on building facades to create a more pleasant presentation to the community, and help accomplish a roofing membrane and drain system to the deck for it's long-term protection.
***
![]() |
| "Rack Storage" brown building |
![]() |
| Recycling Center unloads scrap. |
![]() |
| Transporting sheething to recycler |
![]() |
| Removing is systematically |
![]() |
| Sheeting removed from racks |
![]() |
| Removing the Racks |
![]() |
| Finished with removal |
Thursday, August 11, 2011
De-Construction Part5 - Siding
NOTE: Part of our Vision Statement is to be a Respected Company in the Community. That comes through communication regarding our activities. A portion of our property that is in high profile to the community is undergoing some changes. This communication series is to communicate what is happening.
***
With so much preparation work having taken place, it is time to dismantle the sheathing facing the canal and Roosevelt Drive. It's likely at this stage in de-construction that residents or passerby will wonder what is going on, and thus this communication stream.
The following photos were over just a couple of days.
Link to Part 6.






De-Construction Part4 - Broom Clean Ready
NOTE: Part of our Vision Statement is to be a Respected Company in the Community. That comes through communication regarding our activities. A portion of our property that is in high profile to the community is undergoing some changes. This communication series is to communicate what is happening.



***

The interior of the building is now broom clean with all decking, pipes, electrical, lights and insulation removed. Everything except the insulation and roof materials in the 42,000 sqft building was recycled for it's scrap metal value. The only thing left on the floor is the vertical supports, with connections between the rows which tie it together as a structure with rigidity. The outside sheathing is attached to girts that run the full perimeter.


The view up the river valley is spectacular on a clear day like today. The Yale University Boathouse is barely visible in this one-point perspective photo.
The building's footprint is apx. 42,000 square feet. The racks are over 30 feet high. This yielded 1.2 million cubic feet of storage space. Sadly, it has gone vacant for over 30years due to inability to heat the space and offer something other than "cold storage", and the lack of freight elevator accessibility as would be called for with modern warehouse standards.


The "erector set" of racks is simply held together with pins, and the gravity of the steel horizontal beams holds them in place. These components have been in place since the 1960's, and the structure vacant from use for over 30 years. As such, water that was standing on the floor from roof leaks had caused deterioration to the steel in a few places. The photo shows how rust has eaten like a cancer up this particular vertical support. Unlike structural steel (such as i-beams), rolled steel material is lighter and more susceptible to rust over time. In the few places where regularly in standing water, it thus causes significant rust penetration. This has simply become a safety matter and the structure had to be dismantled.
Wednesday, August 10, 2011
De-Construction Part3 - Siding First
NOTE: Part of our Vision Statement is to be a Respected Company in the Community. That comes through communication regarding our activities. A portion of our property that is in high profile to the community is undergoing some changes. This communication series is to communicate what is happening.
At this stage, the Rack Storage structure has had all of it's roof decking as well as internal accessories removed. It was important to keep the various materials separated: cast iron drain pipe, sheathing sheet metal, roof decking corrugated steel, shelving steel, etc. Fortunately, we have a large yard to sort and separate the materials as seen in adjacent photo.
Keeping materials separated and uniform allowed efficient loading on trucks for consolidated delivery to the scrap yard, and yielding the best scrap price for semi-prepared materials rather than simply dumpsters filled with various components. It also allowed us to make the scrap deliveries ourselves rather than with large containers.

The rear of the structure was our first attempt because it was a bit more complicated. After the fire from the mid 1980's, when the State of CT seized the property, and subsequently sold it to the City of Derby, it was prepared to be marketed as an industrial park. As you might imagine, there were some shortcuts taken in that governmental preparation. On some parts of the structure, they left the existing siding and put on some "Z" girts for attaching a second layer of siding that was more aesthetically pleasing. In between was a layer of insulation, which seems strange since there was never any form of heat provided within the structure.
After the first layer was removed, insulation pulled away, and the second layer of sheathing removed, it left exposed the simple erector set of the storage racks. With this accomplished, to speed the progress and minimize the disruption as witnessed from the street, we removed all the coping that bridged between the siding and the roof (which was removed first).
***
See this blog link to information regarding these racks available for sale
At this stage, the Rack Storage structure has had all of it's roof decking as well as internal accessories removed. It was important to keep the various materials separated: cast iron drain pipe, sheathing sheet metal, roof decking corrugated steel, shelving steel, etc. Fortunately, we have a large yard to sort and separate the materials as seen in adjacent photo.
Keeping materials separated and uniform allowed efficient loading on trucks for consolidated delivery to the scrap yard, and yielding the best scrap price for semi-prepared materials rather than simply dumpsters filled with various components. It also allowed us to make the scrap deliveries ourselves rather than with large containers.
The rear of the structure was our first attempt because it was a bit more complicated. After the fire from the mid 1980's, when the State of CT seized the property, and subsequently sold it to the City of Derby, it was prepared to be marketed as an industrial park. As you might imagine, there were some shortcuts taken in that governmental preparation. On some parts of the structure, they left the existing siding and put on some "Z" girts for attaching a second layer of siding that was more aesthetically pleasing. In between was a layer of insulation, which seems strange since there was never any form of heat provided within the structure.
After the first layer was removed, insulation pulled away, and the second layer of sheathing removed, it left exposed the simple erector set of the storage racks. With this accomplished, to speed the progress and minimize the disruption as witnessed from the street, we removed all the coping that bridged between the siding and the roof (which was removed first).Our next blog entry will show how the preparation paid off with quick work and minimal disruption to the street facing the Canal. Note: while "Canal Street" is technically closed due to a construction project by the United Illuminating electric utility, it is still important to minimize disruption of access for any emergency responders.
Subscribe to:
Posts (Atom)